Developed and sold · South West Queensland

Punch's Creek Stage 1

Developed to a fully approved project with an executed Powerlink connection agreement and sold to EDP Renewables in August 2025 as their Australian flagship.

Punch's Creek site near Millmerran: fenced grassland paddock under a cloudy sky

Project detail

Solar capacity
~480 MWp PV (400 MWac)
BESS
400 MW / 1,600 MWh DC coupled
Grid connection
New 330/33 kV substation, Powerlink 330 kV
Land tenure
30 year + lease option
Owner
EDP Renewables
Location
About 13 km south-east of Millmerran, Queensland (South West Queensland REZ)

About Punch's Creek Stage 1

Punch’s Creek Renewable Energy is a renewable energy project consisting of two stages, located in the heart of the South West Queensland Renewable Energy Zone. The Stage 1 project consists of approximately 480 MWp PV and a 400 MW / 1,600 MWh DC coupled connection into a new 330/33 kV substation.

With direct access to the Powerlink Transmission Network, this site provides the ultimate balance between connection and opportunity.

The site is located on prime land with a 30 year + lease option and has already obtained significant support from the local community.

The project received full development approval in Q1 2024 and EPBC approval in May 2024, with a CHMP executed in 2024 and a Connection & Access Agreement executed with Powerlink in December 2024.

In August 2025, the project was sold to EDPR, a very experienced asset owner internationally, as their flagship asset in the ever-growing Australian renewable environment.

Delivered at point of sale

  • Fully executed grid connection with Powerlink Queensland
  • Development approval from Toowoomba Regional Council
  • EPBC approval
  • Executed Cultural Heritage Management Agreement with traditional owners
Now owned by EDP Renewables (EDPR)

Acquired August 2025 as EDPR’s flagship Australian asset.

Development pathway

Punch's Creek Stage 1 milestones.

  • Q1 2024Full development approval received
  • May 2024EPBC approval received
  • 2024Cultural Heritage Management Plan executed
  • Dec 2024Connection & Access Agreement with Powerlink
  • Aug 2025Sold to EDP Renewables
  • 2025Awarded Capacity Investment Scheme Tender 4 support

Independently confirmed

Not just
our word.

Each statement below is drawn from a public document published by a third party, not by SkyLab.

  • EDP Renewables

    “EDPR Australia acquired Stage 1 of the project from the previous proponent, SkyLab, in August 2025.” - EDPR community fact sheet, December 2025.

  • Australian Government (DCCEEW)

    Punchs Creek Solar Farm listed in Capacity Investment Scheme Tender 4 results under EDPR: solar + battery, 400 MW / 1,600 MWh, Queensland.

  • EDP Renewables

    Up to 510 jobs during construction and around 10 ongoing roles across an expected 35 years of operations.

  • EDP Renewables

    Locates the Punchs Creek Renewable Energy Project “about 13 km south-east of Millmerran and 64 km south-west of Toowoomba”. - EDPR project page.

On site

Site layout and approvals

The plans behind it.

Overall site layout across both stages.
Overall site layout across both stages.
Stage 1 array layout and 330/33 kV substation connection.
Stage 1 array layout and 330/33 kV substation connection.